The group is specialized in the planning and management of road, railway, airport infrastructure, tourist hotel settlement and network technological systems.
Our company boasts works certified and executed for over € 1.000.000.000 in the infrastructure and tourist/hotel sectors with an important know-how in roads, junctions, undergrounds, railroads, airport runaways, cycle paths, hotels, museums, and shopping mall planning.
The group, mainly through the engineering company Studio4c srl, performs professional consulting activities in the field of the following sectors: planning, works management, security (security coordination during the planning and execution stages, Workers’ Safety Representatives), static and administrative tests, support activity for Tender Responsible Officer, measures and accounting work, fire prevention.
With a team of external business experts and consultants well experienced and able to satisfy the many aspects required within the drafting of the offers, the company is able to offer to the business – or to other studies in the case of public design contests – the necessary support for the arrangement of the improved technical solutions, by proposing always original and cost-efficient solutions to the Administrations.
Moreover, the different proficiencies in our company made possible for the group to specialize in the preparation of business and financial plans, and of projects for Project Financing in several areas.
Besides, the company has recently aimed for innovation by introducing BIM (Building Information Modeling) methodology in the design area. The BIM procedure allows to support communication, cooperation, simulation, optimal improvement of a project throughout the over-all life-cycle of the built work (design phase, realization phase, usage and maintenance phase).
In summary, the special features of the group in the engineering services sector are:

• Twenty-year experience in the sectors of planning, construction supervision, safety on building sites, technical support for competitions with economically advantageous tender, technical-administrative and accounting support in systems of public-private partnership (project financing, availability contracts, etc.), BIM systems.
• Works designed and/or directed for a certified total amount of more than € 1 billion
• More than 20 procedures awarded with the criterion of the most economically advantageous bid (tendering procedures and project financing) in the last 5 years.
• Experienced staff in the elaboration of tenders technical offer and technical, administrative and counting support in project financing.
• Trained and competent staff in the employment of BIM systems.
• Our main clients: ANAS, Eurolink SPA, Railroad Circumetnea, COCIV spa, Ministry of Defence, Sicilian Region Authority, Superintendence BBCCAA Catania, about 50 municipality in Italy, building companies and others important private.

PERFORMANCE LEGEND

PP = Preliminary Project | FP = Final Project | EP = Executive Project | SCDS = Safety Coordination in the Design Stage | CS = Construction Supervision, measurement and counting | SCES = Safety Coordination in the Execution Stage | ATT = Technical and Administrative testing | ST = Static Testing | SA = Safety Audit | ORTS = TenderResponsible Officier support | SVC = Seismic Vulnerability Checking | EAT = Economically Advantageous Tender

http://ATT%20for%20the%20“Realization%20of%20the%20new%20S.%20Marco%20Hospital”

ATT for the “Realization of the new S. Marco Hospital”

2012/In corso - General Hospital Vittorio Emanuele of Catania
http://EP%20of%20the%20shopping%20mall%20“IL%20MANDARIN”%20in%20S.%20A.%20Li%20Battiati

EP of the shopping mall “IL MANDARIN” in S. A. Li Battiati

2015/2017 – Jo-Fa-S.A.B. Capital Group s.r.l.
http://ST%20for%20N.A.T.O.%20%20jetty%20access%20ramp

ST for N.A.T.O. jetty access ramp

2017 - Direction of Military Engineering for the Augusta Marina
http://CS%20of%20the%20intervention%20on%20the%20municipal%20urban%20road%20network

CS of the intervention on the municipal urban road network

2014/2015 – Municipality of Belpasso (CT)
http://PP,FP%20and%20EP%20for%20“the%20completion%20of%20the%20municipal%20cemetery”

PP,FP and EP for “the completion of the municipal cemetery”

2012/2014 – Municipality of Valverde (CT)
http://EAT%20Drafting%20for%20the%20municipal%20cemetery%20extension

EAT Drafting for the municipal cemetery extension

2014 – Municipality of Maniace (CT)
http://Work%20direction%20for%20Giovanni%20XXIII%20Square%20upgrading

Work direction for Giovanni XXIII Square upgrading

2012/2013 - Municipality of Granmichele (CT)
http://EAT%20and%20executive%20project%20drafting%20“Catania%20new%20prison”

EAT and executive project drafting “Catania new prison”

2013 – EAT and executive project drafting “Catania new prison”
http://FP,%20EP,%20SCDS%20works%20for%20the%20Marina%20Ponente%20street%20extension

FP, EP, SCDS works for the Marina Ponente street extension

2011/2012 - Municipality of Augusta (SR)
http://FP%20for%20the%20restoration%20of%20monumental%20ruins%20in%20XX%20Settembre%20street

FP for the restoration of monumental ruins in XX Settembre street

2011 – Intermunicipal Consortium Tindari/Nebrodi
http://PP%20for%20the%20realization%20of%20the%20North%20ringroad

PP for the realization of the North ringroad

2009/2010 - Comune di Tremestieri Etneo (CT)
http://EP,%20SCDS%20for%20the%20“Urban%20Park%20works%20of%20Giardino%20Square”

EP, SCDS for the “Urban Park works of Giardino Square”

2009 - Municipality of Linguaglossa (CT)
http://EP%20of%20the%20connecting%20road%20system%20craft%20area%20works

EP of the connecting road system craft area works

2009 - Comune di San Giovanni La Punta (CT)
http://EP%20of%20the%20Cibali-Rapisardi%20area%20sewers

EP of the Cibali-Rapisardi area sewers

2004 - Municipality of Catania